IDOT Announces Five Year Project Plan

By Stephanie Malench

[email protected]

Each year the Illinois Department of Transportation (IDOT) develops a fiscally constrained si0yeear program that details how it will invest in the state and local highway system. The Fiscal Year 2022-2027 Proposed Highway Improvement Program (sometimes referred to as the Multi-Year Program, or MYP) totals $20.7 billion and includes a FY 2022 annual highway program of $3.32 billion.

Public involvement is an important component of all transportation system plans and programs. Every year, IDOT solicits feedback on the Multi-Year Program and considers these comments during development of the next six-year program cycle. The public is encouraged to participate in the planning and development of transportation across the state by sending the public comment form on page 19 of the FY 2022-2027 Proposed Highway Improvement Program available at https://idot.illinois.gov.about-idot/stay-connected/blog/rbi-year-two to Illinois Department of Transportation

Office of Planning and Programming

Bureau of Programming

2300 S. Dirksen Parkway, Room 307

Springfield, IL 62764 or call 1-800-493-3434

2022 Projects

Illinois 143, 160 and US 40 from .1 mile east of ILL 143 W Junction (Walnut St. to Ill 143 E. Junction: Smart Overlay- $1.8 million.

Illinois 159 from .1 mile north of Center Grove Rd in Edwardsville to Kinloch Ave in Collinsville: Standard Overlay and ADA Improvements- $12. million.

Illinois 162 and 157 intersection: Land Acquisition and Utility Adjustment to move relocate the North Junction to the South Junction- $3 million.

Clay St. From N. Main St. to N. Hickory/Staunton Rd.  and N. Hickory St./Staunton Rd. to N. Dewey St. in Troy: Standard overlay- $902,000.

Interstate 55/70/US 40 at Pleasant Ridge Rd, Maryville: Land acquisition- $500,000.

Keebler Rd .1 mile South of Illinois 162 to Old Keebler Rd: Standard Overlay- $415,000.

Interstate 55/4 US 40 Illinois 3 and Illinois 3 ramps at the Poplar Street Complex and from the Mississippi River to Interstate 64 interchange: engineering for location, design and environmental studies and engineering for contract plans- $8.1 million.

Interstate 270 at Mississippi River and to the Chain of Rocks Canal Bridge: land acquisition and utility adjustments- $1.8 million.

Interstate 270 from the Mississippi River Bridge to Illinois 3: Engineering for contract plans- $3 million.

2023-2027 Projects

Interstate 55/4 US 40 Illinois 3 and Illinois 3 ramps at the Poplar Street Complex and from the Mississippi River to Interstate 64 interchange: Reconstruction of 2.7 miles, bridge replacement, bridge joint replace/repair, bridge deck overlay, bridge painting, bridge deck repairs, bridge repair, bridge approach roadway, engineering for location, design, and environmental studies, engineering for contract plans, land acquisition, utility adjustments and construction engineering- $188.5 million.

Interstate 270 at Mississippi River and to the Chain of Rocks Canal Bridge: Additional lanes on 1.4 miles, a bridge replacement, engineering for contract plans, land acquisition, utility adjustments and construction engineering- $257.6 million.

Interstate 270 from Mississippi River Bridge to Illinois 3: Interchange reconstruction, engineering for contract plans, bridge deck sealing, land acquisition and utility adjustments- $42.7 million.

Illinois 162/157 at Judy’s Branch Creek and intersection relocation from the north junction of Illinois 157 to the south junction of Illinois 157: Bridge replacement, intersection reconstruction, a new bridge, pedestrian overpass, land acquisition, utility adjustments and construction engineering- $22 million.

Interstate 55/70/US 40 at Pleasant Ridge Rd, Maryville: Utility adjustment, bridge replacement- $4.8 million.

US 40 2.9 miles east of Formosa Rd to Bethany Dr.: engineering, construction engineering, land acquisition, utility adjustment, additional lanes, intersection reconstruction, bi-directional left turn lane- $34 million.

Illinois 159 at Beltline Rd in Collinsville: Land acquisition, utility adjustments, intersection reconstruction- $5 million.

Beltline Rd from 157 to 159 in Collinsville: Standard overlay, ADA improvements- $3.6 million.

Keebler Rd in Maryville from .1 mile south of Illinois 162 to N of West Main St. Standard overlay- $1.27 million.

Keebler Rd from Lorry Ln to north of W. Main St.: construction engineering- $39,000.

Spring Valley Rd in Troy from .1 mile north of Austin Dr. to .1 mile south of Charleston Dr.: Standard overlay and sidewalks- $829,000.

Summitt Ave in Collinsville from Notting Hill Ct. to Alco Dr.: Standard overlay- $573,000.

Leave a Comment