Triad High School construction photos from early April

Work continues on the Triad High School addition at the school’s rear. This image was taken April 8. (Ray Popkess photo)

The project, which is part of the Triad School District’s $99.2 million bond issue approved in April 2025, hs meant a lot of excavating and earthmoving behind the high school. (Ray Popkess photo)

At least one mature tree had to be removed before construction could begin and several pillars have been bored into the soil and below. When finished, the school will boast state-of-the-art career and technical education classes (CTE), as well as new art classrooms and a new gathering space for the entire student body. (Ray Popkess photo)
